IE 412
fall 2016
All Classes
OR Models for Mfg Systems
Credit: 3 OR 4 hours.
Operations research techniques applied to problems in manufacturing and distribution. Single and multi-stage lot sizing problems, scheduling and sequencing problems, and performance evaluation of manufacturing systems.
3 undergraduate hours. 3 or 4 graduate hours. Prerequisite: IE 310.

- Section Status Closed

- Section Status Open

- Section Status Pending

- Section Status Open (Restricted)

- Section Status Unknown
Section Status updates every 10 minutes.
| Detail | Status | CRN | Type | Section | Time | Day | Location | Instructor |
|---|