CEE 410
Spring 2011 All Classes
Credit: 3 OR 4 hours.
Railway traffic control and signaling systems; train performance and scheduling tools; analysis of temporal and spatial separation of trains for safety and efficiency; train movement authority and operating rules, track circuit and wireless train position monitoring technology; interlocking design; railroad capacity modeling tools; economic analysis of traffic control system design, optimization, and selection. Field trip to observe signal system infrastructure and railway traffic operations control center.
3 undergraduate hours. 3 or 4 graduate hours. Prerequisite: CEE 408.
| CRN | Type | Section | Time | Day | Location | Instructor | Section Details | |
|---|---|---|---|---|---|---|---|---|
|
51457
|
Lecture-Discussion
|
RO3
|
3:00PM
-4:20PM
|
MW
|
1233 Newmark Civil Engineering Bldg
|
Barkan, C
|
|
|
|
52965
|
Lecture-Discussion
|
RO4
|
3:00PM
-4:20PM
|
MW
|
1233 Newmark Civil Engineering Bldg
|
Barkan, C
|
|